-
Strong adhesion in curtain rail installation High adhesion to concrete and plastered surfaces Fastening without screwing Provides solid contact by filling the gap Fast curing Apply to the back of the curtain rail or as a strip to the ceiling.
-
, press firmly by aligning with the ceiling and hold steady for a few minutes.
-
, The first attachment occurs in a short time, observe the waiting time for full cure.
-
(It will be healthier to wear the curtain after 24 hours)


