-
AREAS OF USE
-
pipes
-
WATER INSTALLATIONS
-
Rebates
-
ROOFS
-
Terraces
-
BUILDING EXTERIORS
-
JOINT SPACING
-
WINDOW/DOOR SURROUNDS
-
Cars
-
Boats
-
APPLICABLE SURFACES
-
Metal
-
ALUMINIUM
-
wooden
-
PVC
-
Undercoat
-
Asphalt
-
concrete
-
Bricks
-
PLASTER GALVANIZED METAL
-
ROOFING MATERIALS
-
FIBERGLASS
-
IMPLEMENTATION
-
Shake for 1 minute.
-
Test on a piece of cardboard before proceeding with the application to feel and grasp the spray pattern.
-
Spray at a distance of 15 cm to 45 cm from the surface.
-
Using a sweeping motion, spray evenly on the surface.
-
It is recommended to apply in two coats.
-
After a light first coat application, 15 – 30 minutes before the second coat application.
-
Allow the first layer to dry until.
-
You can apply the second layer thicker.
-
Bubbles can be seen on the first coat application, but they disappear as they dry up.
-
For good results, apply at ambient temperatures above 15°C.
-
Cures within 2 hours, takes 24 hours to fully dry.
-
We can make splashes during spraying, we recommend wearing gloves and work aprons to prevent splashes on your hands or clothes.
-
It can drip on the floor in vertical applications, we recommend laying a cover or piece of cardboard to protect the floors.
-
If there are areas you want to protect around the area to be applied, it is recommended to use paper tape.


